Manifold kits simplify boiler installation

Manifold
Hamworthy has improved the design of manifold kits for its Wessex ModuMax boilers to make them easier to install.
To simplify installation, Hamworthy Heating has improved the water manifold kits used with its Wessex ModuMax range of gas-fired boilers. The manifold kits are now factory assembled and hydraulically tested to provide reassurance before the system is filled. The kits have isolation valves to enable each boiler to be maintained separately without shutting down the whole system. Pipework is pre-sized to suit conditions at each boiler. To overcome alignment problems, the manifold kits now have adjustable feet and flexible connections. Boilers in the ModuMax range have maximum outputs from 110 to 750 kW. They are available as condensing and non-condensing versions and have pre-mix fully modulating burners.
Related links:



modbs tv logo

HS2 Code of Practice is good news for JIB members

High Speed Two Limited (HS2 Ltd) has released its Employee and Industrial Relations (EIR) Code of Practice (the Code), which brings significant advantages to Joint Industry Board (JIB) member companies looking to work on one of the most demanding and exciting transport projects in Europe.

Industry leaders gather at CIBSE’s Measuring Performance and Facilities Management conference

CIBSE’s Measuring Performance and Facilities Management conference recently brought together leading voices from across the built environment
to explore the evolving landscape of building performance and operational excellence.