Distribution boards incorporate L2 energy metering facilities

• Separate meter packs that can be installed with Type A single-phase and Type B 3-phase Memshield 2 distribution boards. Both options are available with a split-metering option to enable small-power and lighting loads to be metered separately. Mike Lawrence, product manager for commercial assemblies, says, ‘There is a huge market for MCB distribution board, but in future many of these will need metering of the incoming supply. Eaton’s new Memshield 2 meter packs and Type A boards with integral metering offer contractors a cost-effective way to meet these requirements without having to resort to special factory-built solutions.’
For more information on this story, click here:Nov 07, 170