ICS mixes the new with the old

ICS
Integrated Control Systems has successfully blended the old with the new with a technically challenging control project in St Magnus House
A technically challenging project involving the design and installation of new plant and controls to operate alongside existing refurbished equipment has been completed by Integrated Control Systems. The project involved building four new control panels to operate new and retained refurbished equipment and a full fit-out of the upper four floors of the 8-storey St Magnus House overlooking the River Thames close to Tower Bridge in London. ICS also created a landlord’s interface with equipment fitted by others on the lower floors, enabling the monitoring of three separate electricity supplies to all the floors and the isolation of chilled and low-pressure hot water and ventilation equipment. Nine riser interfaces were fitted across the development. The contract was awarded by Skanska Rashleigh Weatherfoil.
Related links:



modbs tv logo

Siderise Innovation Centre achieves UKAS accreditation

Siderise has announced its Innovation Centre has achieved UKAS ISO 17025 accreditation, validating that it operates with the highest technical competency and generates reliable results.

One in five building service engineers unfamiliar with overheating regulations

New research has revealed that 20% of building service engineers are unfamiliar with the UK Building Regulations’ Approved Document O, which addresses overheating in buildings – and almost half (46%) claim to understand the theory behind it but are unsure how to put it into practice.