ICS mixes the new with the old

ICS
Integrated Control Systems has successfully blended the old with the new with a technically challenging control project in St Magnus House
A technically challenging project involving the design and installation of new plant and controls to operate alongside existing refurbished equipment has been completed by Integrated Control Systems. The project involved building four new control panels to operate new and retained refurbished equipment and a full fit-out of the upper four floors of the 8-storey St Magnus House overlooking the River Thames close to Tower Bridge in London. ICS also created a landlord’s interface with equipment fitted by others on the lower floors, enabling the monitoring of three separate electricity supplies to all the floors and the isolation of chilled and low-pressure hot water and ventilation equipment. Nine riser interfaces were fitted across the development. The contract was awarded by Skanska Rashleigh Weatherfoil.
Related links:



modbs tv logo

Government must do more to tackle heat pump and electric vehicle barriers, Which? says

Which? is calling on the government to provide more support for greener home heating and cars, as new research shows cost and other barriers are putting people off making the switch.

New study reveals job stress affects 70% of construction workers

A groundbreaking study conducted by researchers from the University of Cambridge has revealed that at least 70% of people in the construction industry report feeling stressed at work, and this not only has a negative impact on job performance but also personal life. The findings highlight the urgent need for effective strategies to combat workplace stress.