ICS mixes the new with the old

ICS
Integrated Control Systems has successfully blended the old with the new with a technically challenging control project in St Magnus House
A technically challenging project involving the design and installation of new plant and controls to operate alongside existing refurbished equipment has been completed by Integrated Control Systems. The project involved building four new control panels to operate new and retained refurbished equipment and a full fit-out of the upper four floors of the 8-storey St Magnus House overlooking the River Thames close to Tower Bridge in London. ICS also created a landlord’s interface with equipment fitted by others on the lower floors, enabling the monitoring of three separate electricity supplies to all the floors and the isolation of chilled and low-pressure hot water and ventilation equipment. Nine riser interfaces were fitted across the development. The contract was awarded by Skanska Rashleigh Weatherfoil.
Related links:



modbs tv logo

BSRIA reports sustained global cooling demand as market diverges

BSRIA has released its latest analysis of the global cooling sector. The BSRIA Worldwide Air Conditioning and Heat Pump reports reveal a complex and diverging global cooling market.

CABE awards two new accolades alongside 2026 Honorary Fellowship

At the CABE presidential inauguration on 8th May, the Association was delighted to present two new awards for 2026 alongside its Honorary Fellowship for this year.