CHP reaches new heights in new residential development in London

Ener-g
The UK’s tallest residential building will include a 135 kW(e) CHP supplied by Ener-g.
he CHP system being supplied by Ener-g for the UK’s tallest residential building, Pan Peninsula next to Canary Wharf, is expected to cut carbon-dioxide emissions by 207 t a year. The CHP system is part of M&E systems being installed by Haydon Mechanical & Electrical for Ballymore Properties. The £27 million Pan Peninsula project is due to be completed in 2009 and comprises two towers. The taller tower will be 149 m high and have 50 floors. The development comprises 762 luxury apartments, a private cinema, sports and spa centre and a landmark waterside restaurant. The CHP system will have an electrical output of 135 kW and 215 kW of heat from an Ener-g 135 reciprocating engine using natural gas. It has on-board micro-processor control and protection, and can be monitored remotely.
For more information on this story, click here: March 08, 139
Related links:



modbs tv logo

Fujitsu General Air Conditioning becomes GENERAL HVAC Solutions UK

Fujitsu General Air Conditioning (UK) has become GENERAL HVAC Solutions UK from 1st January 2026, strengthening its long-term position within the global Paloma Rheem Holdings (PRH) group.

Market performance indicates encouraging signs for future of BEMS sector

Highlighting an increased desire from property developers, architects and designers to decarbonise the UK’s building stock through the specification and implementation of building controls and automation, the building energy management systems (BEMS) market showed steady progress in Q3 – rising 2.6% compared to the previous quarter.