9 MW chilled-water air-conditioning installation includes free cooling

Aermec free-cooling water chillers are providing energy-efficient cooling at 55 Baker Street in London by delivering free cooling without the need for glycol circulation in the primary chilled-water system. Developed by London & Regional Properties, this 100 000 m2 building is designed for mixed use. 16 Aermec NSB stepless air-cooled screw-compressor chillers have been installed to provide over 9 MW of cooling at 32°C ambient temperature. It is believed to be the largest free-cooling water chiller installation in the UK. Total Concept Solutions, the London regional Aermec representative, worked with M&E consulting engineers Blyth & Blyth to configure a solution for this prestigious project. Aermec chillers are fully Eurovent certified.
For more information on this story, click here: March 08, 137
Related links:



modbs tv logo

Fujitsu General Air Conditioning becomes GENERAL HVAC Solutions UK

Fujitsu General Air Conditioning (UK) has become GENERAL HVAC Solutions UK from 1st January 2026, strengthening its long-term position within the global Paloma Rheem Holdings (PRH) group.

Market performance indicates encouraging signs for future of BEMS sector

Highlighting an increased desire from property developers, architects and designers to decarbonise the UK’s building stock through the specification and implementation of building controls and automation, the building energy management systems (BEMS) market showed steady progress in Q3 – rising 2.6% compared to the previous quarter.