Lighting rafts expose thermal mass of headquarters building

Enabling the thermal mass of this new headquarters building in Dublin to deliver 25 W/m2 is the use of SAS Internal acoustic lighting rafts.
SAS International acoustic lighting rafts are playing a key role in reducing the carbon footprint of the new headquarters of the Commissioners of Irish Lights (CIL) in Dublin by enabling the thermal mass of the building to be exploited. The ceiling has been designed as a feature in its own right. System 600 ceiling rafts have been installed in radial coffers throughout the open-plan office. They are perforated acoustic rafts that incorporate luminaires. This alternating design has been enhanced by coffers with curved ends to emphasis the circular nature of the atrium. System 600 rafts expose the concrete soffit, allowing the thermal mass of the building to be exploited. By allowing free air movement to the exposed concrete slabs, 25 W/m2 of cooling can be achieved — while offering design flexibility and reducing capital and installation costs. The building was designed by architects Scott Tallon Walker, whose project director David Cahill says, ‘Our brief was to design a 21st century landmark building which was also sensitive and reflective of the surrounding historic structures and marine environment. We worked with SAS International to design a ceiling system that would serve as one of the building’s features while ensuring that we adhered to CIL’s vision statement of delivering reliable, efficient and cost-effective services to the navigation industry.
For more information on this story, click here: Jun, 08 141
Related links:
Related articles:



modbs tv logo

‘Red tape scrapping is welcome – but more policy changes are needed’

The CEO of heat pump manufacturer Aira UK has said the government’s new proposals to scrap planning red tape for the installation of heat pumps in the UK will be a big breakthrough for the industry and consumers – but more policy changes are needed.

New procurement rules for NHS suppliers

New procurement rules mean NHS suppliers will need to demonstrate their green credentials so the NHS can achieve its target of becoming net zero for directly-controlled emissions by 2040, with an ambition to reach an 80% reduction in its carbon emissions between 2028 to 2032.