Keston boilers deliver two temperatures at the same time

Boiler rig
110 kW condensing boilers from Keston can be installed in a wall-hung rig and provide two different flow temperatures.
Two ranges of wall-hung modulating gas-fired condensing condensing boilers from Keston have two pairs of flow and return tappings for separate connection to heating and DHW circuits. They can deliver two different flow temperatures at the same time to serve, for example, a fast-recovery indirect cylinder and underfloor heating. The C90 range covers outputs from 22 to 90 kW and the C110 range covers 28 to 110 kW. For large commercial applications, these boilers can be supplied in a bespoke prefabricated plant rig. High-efficiency stainless-steel heat exchangers are combined with low-emission burners in a compact cabinet. The heat exchangers are highly resistant to corrosion and their corrugated pipes provide a massive surface area in a compact space. Integral pumps are automatically controlled to match water flow to heat output. There is also an integral pump-exercise function. Integral flue check valves prevent reverse circulation of combustion products, and there is also a frost-protection thermostat. Optional accessories include an external control interface that can directly drive the boilers from a 0 to 10 V signal and an outside sensor connection for an outdoor sensor. The 100 mm plastic flue system can be up to 30 m long, both horizontally or vertically.
Related links:



modbs tv logo

Smart Buildings Show announces full conference programme for 2021

Smart Buildings Show, the UK’s leading, dedicated smart buildings event, has unveiled its 2021 conference programme. The event, supported by headline sponsor Bluetooth, will take place at ExCeL London on 6-7 October 2021, featuring industry-leading speaker sessions from some of the sector’s most renowned brands, including Bluetooth, Johnson Controls, Microsoft, Schneider Electric,  Siemens Smart Infrastructure and Vodafone.

Actuate UK issues climate warning to world leaders ahead of COP26 and urges action “before it is too late”

With six weeks to go until COP26, engineering alliance Actuate UK has issued a stark message to world leaders gathering in Glasgow, urging them to tackle the climate crisis now “before it is too late”.

Calendar