Clyde Energy Systems is admitted to Charterhouse
Charterhouse School near Godalming in Surrey is upgrading its entire heating system with high-efficiency units from Clyde Energy Solutions. So far 11 CG wall-hung condensing boilers have been installed to heat a range of buildings, including teaching blocks, boarding houses and the theatre. They have outputs from 60 to 100 kW.
The boilers are linked to the school’s integrated energy-management system, which allows central control and local over-rides to optimise energy consumption.
The school has over 700 pupils, nearly all boarders. The buildings are spread over an extensive site, so a large number of ‘local’ boilers is required. The CG condensing boilers provide the school with a reliable, energy-efficient solution that combines low energy consumption with low water content for fast heat up.