Village hall converts from electricity to biomass

Windhager, biomass boiler
Electric storage heaters in this village hall in Dorset have been replaced with a biomass system using a Windhager boiler.

Windhager’s BioWIN wood-pellet boiler has been installed in Netherbury Village Hall in Dorset as part of a complete refurbishment and extension of the building. The project was funded by the Community Buildings Programme from the Big Lottery Fund. The 26 kW boiler was installed by Wessex Ecoheat to replace inefficient electric storage heaters.

Fuel is stored in a Windhager BioTOP external storage hopper with underground hose so that fuel can be sucked to the boiler.

Fuel is supplied by a local company which checks the fuel level each month.

All Windhager’s biomass heating systems are certified under the Microgeneration Certification Scheme, so installations will qualify for the Renewable Heat Incentive due to be introduced in April 2011.

For more information on this story, click here:  sept 2010, 89
Related links:
Related articles:



modbs tv logo

Baxi survey reveals care home leaders need support to achieve heat decarbonisation goals

Baxi recently surveyed over 400 senior and middle management care home managers in both the private and public sector this summer in an effort to understand the enablers required to help decarbonise the sector.

CIBSE launches Society of Vertical Transportation to elevate standards worldwide

CIBSE has officially launched the Society of Vertical Transportation (SoVT), an international professional community for individuals and organisations working across the design, engineering, installation and innovation of lifts, escalators and emerging vertical mobility systems.