Village hall converts from electricity to biomass

Windhager, biomass boiler
Electric storage heaters in this village hall in Dorset have been replaced with a biomass system using a Windhager boiler.

Windhager’s BioWIN wood-pellet boiler has been installed in Netherbury Village Hall in Dorset as part of a complete refurbishment and extension of the building. The project was funded by the Community Buildings Programme from the Big Lottery Fund. The 26 kW boiler was installed by Wessex Ecoheat to replace inefficient electric storage heaters.

Fuel is stored in a Windhager BioTOP external storage hopper with underground hose so that fuel can be sucked to the boiler.

Fuel is supplied by a local company which checks the fuel level each month.

All Windhager’s biomass heating systems are certified under the Microgeneration Certification Scheme, so installations will qualify for the Renewable Heat Incentive due to be introduced in April 2011.

For more information on this story, click here:  sept 2010, 89
Related links:
Related articles:



modbs tv logo

Fujitsu General Air Conditioning becomes GENERAL HVAC Solutions UK

Fujitsu General Air Conditioning (UK) has become GENERAL HVAC Solutions UK from 1st January 2026, strengthening its long-term position within the global Paloma Rheem Holdings (PRH) group.

Market performance indicates encouraging signs for future of BEMS sector

Highlighting an increased desire from property developers, architects and designers to decarbonise the UK’s building stock through the specification and implementation of building controls and automation, the building energy management systems (BEMS) market showed steady progress in Q3 – rising 2.6% compared to the previous quarter.