Danlers heater boost switch for simply saving energy

Danlers, controls

Danlers’ heater boost switch for the control of electric heating loads automatically turns the load off after a selected time period has elapsed. There are four different time settings to choose from (15 min, 30 min, 1 h and 2 h). Pressing the button selects each timelag choice in turn. The switch is manufactured in the UK and is designed for use with immersion heaters, heated towel rails and other suitable electric heating loads. It is ideal for use in student accommodation blocks, hotels, military accommodation etc.

For more information on this story, click here: November 10, 209
Related links:
Related articles:



modbs tv logo

Heat pump market represents a colossal opportunity, says BESA

BESA’s head of technical Graeme Fox said the heat pump market represented “an absolutely colossal opportunity” for suitably qualified engineers but warned that the industry would have “to rapidly scale up capacity and needed considerable investment in additional skills to deliver all these hugely ambitious targets”.

Mitsubishi Electric launches modular R32 e-series chiller

Mitsubishi Electric has launched an R32 version of its popular e-series chillers, available in 150kW and 180kW units. 

Calendar