Evomax boilers are now available for LPG

Boilers, Ideal Commercial, LPG
LPG versions of Ideal Commercial’s Evomax wall-hung boilers are now available.

Ideal Commercial now offers a wall-hung LPG boiler as part of its Evomax range. There are four models with outputs from 30 to 80 kW delivering seasonal efficiencies in accordance with Part L of the Building Regulations and low NOx emissions. They can modulate down to 20% of full output.

Boilers can be combined in cascade arrangements to achieve a maximum output of 480 kW. Their high standard specification includes remote indication, BMS control, hours run, frost protection and weather compensation. The cast aluminium-silicon alloy heat exchanger has integral connections and a monobloc construction for reliability. The design achieves a reduction in the number of individual components to increase dependability.

For ease of installation, system connections are at the rear and boilers can be arranged in back-to-back or inline cascades. They have a low lift weight and small dimensions (850 mm high, 500 mm wide and 360 mm deep).

Evomax LPG boilers are designed to work with the same option kits as the equivalent natural-gas models. There is a comprehensive selection of insulated frame and header kits, a choice of room-sealed and open-flue systems, as well as the existing Imax W modulating sequencer and room sensor. Also available are a programmable room thermostat, outside sensor, tank sensor, safety interlock and pump kits.

For more information on this story, click here: September 2011, 103
Related links:
Related articles:



modbs tv logo

Finalists announced for the 2025 Pump Industry Awards

The Pump Industry Awards has revealed its highly anticipated finalists for 2025, showcasing the very best in innovation, performance and contribution across the pump sector. The winners will be celebrated at the prestigious gala dinner on Thursday 13th March at the Hilton Hotel, St. Georges Park in Burton on Trent.

Electrical businesses brace for project delays in 2025

The latest quarterly Building Engineering Business Survey (BEBS) has revealed that close to two thirds (63%) of electrotechnical and engineering services businesses are worried about delays to projects and the impact this can have on cashflow.