Pre-fabricated wiring axes installation times

A family of modular wiring systems from Apex Wiring Solutions is described as providing a faster and more flexible alternative to conventional wiring for lighting, underfloor power and ‘buswire’ distribution systems. The use of these prefabricated modules with connectors and cable assemblies can reduce installation time by up to 70%. The lighting distribution system is available as armoured and non-armoured versions. The underfloor system provides a cost-effective alternative to traditional hard-wired and linear busbar systems. ‘Buswire’ combines the benefits of flood wiring with connectivity for building networks. All systems can be engineered for bespoke applications.
Related links:



modbs tv logo

BEMS market shows promising performance upturn

Highlighting a determination from building owners to reduce energy consumption through technology, the building energy management systems (BEMS) market saw a 1.4% quarter-on- quarter increase in Q4 2024 – according to the Building Controls Industry Association’s (BCIA) latest market report.

Construction Carbon and CIBSE collaborate to provide environmental skills training

Construction Carbon, in collaboration with CIBSE, has announced the development of the Lifecycle Carbon Assessor Practitioner Training programme.