Two 450 kW chillers and a host of other equipment were provided by Carrier Rental Systems to control the temperature in a data centre providing vital billing functions for several major service providers while power feeds serving the fixed cooling installation were interrupted for checking. These power feeds could only be checked at weekends, and once the power was cut off, the air-conditioning system also had to be cut off.



modbs tv logo

Heat network confidence outpaces progress in social housing

Baxi surveyed 100 housing associations and 102 local authorities and councils responsible for managing or operating heat networks this summer, alongside in-depth interviews with five housing associations, a heat network consultant and heat network contractor.

Signify showcases F1 lighting partnership at Brackley campus

MBS Features Editor Russell Drury was among a group of journalists from across Europe invited to visit the Mercedes-AMG PETRONAS Formula One Team’s headquarters in Brackley, where Signify showcased its partnership with the team and the shared focus on innovation and sustainability.