Mikrofill supports CHP and solar installation

maintenance, refurbishment, Mikrofill, CHP. solar thermal, DHW, hot water

As part of the CHP-based system and solar-thermal installation for updating heating and hot water at Rydale Swimming Pool in Pickering, Mikrofill has supplied boilers and energy-efficient hot-water cylinders.

Equipment installed by H. Pickup Mechanical & Electrical services of Scarborough includes two floor-standing boilers with a combined output of 700 kW and turndown to 35 kW. These boilers also supply two Extreme hot-water loading systems to produce up to 2370 l/h at 60°C while keeping the boilers in condensing mode.

Consulting engineer for the project was Preston Lee Chambers of Cheshire.

For more information on this story, click here: March 2014, 102
Related links:
Related articles:



modbs tv logo

Hydrogen is unlikely to be the golden ticket to decarbonisation heat in buildings

Hydrogen has been hyped for heat for meeting the UK’s zero carbon target. 

NG Bailey relocates to new Manchester Office

NG Bailey has relocated to a new office in the heart of Salford Quays. The business has chosen Building 5 at Exchange Quay as its new regional base in the North West.

Calendar