Lowara booster sets are WRAS approved

DHA, water services, Lowara, booster set

The Lowara range of booster sets from Xylem Water Solutions UK now has WRAS approval. These packaged sets are suitable for all building-services applications — including domestic dwellings and office buildings and shopping centres.

Throughputs range from 1 to 22 m3/h. Configurations include fixed speed or variable-speed using Xylem’s Hydrovar pump controller.

Options include stainless-steel baseplates, control panels and WRAS-approved breaktanks.

For more information on this story, click here: July 2014, 109
Related links:
Related articles:



modbs tv logo

Government must do more to tackle heat pump and electric vehicle barriers, Which? says

Which? is calling on the government to provide more support for greener home heating and cars, as new research shows cost and other barriers are putting people off making the switch.

New study reveals job stress affects 70% of construction workers

A groundbreaking study conducted by researchers from the University of Cambridge has revealed that at least 70% of people in the construction industry report feeling stressed at work, and this not only has a negative impact on job performance but also personal life. The findings highlight the urgent need for effective strategies to combat workplace stress.