HRS Hevac delivers hot-water services to Commonwealth Games

DHW, water services, HRS Hevac
Hot-water for the athletes village at the 2014 Commonwealth Games is provided by two packaged units from HRS Hevac.

Hot-water services for the purpose-built athletes village for the 2014 Commonwealth Games in Glasgow are provided by two bespoke skid-mounted packages supplied by HRS Hevac via contractor Vital Energi. The skids were designed and drawn (3D) in house by HRS Hevac.

The larger skid contains a 2 MW and a 1 MW plate heat exchanger, plus all controls, valves and wiring.

Because of space restraints on site, delivery was in sections for reassembling on site. The packages were insulted in situ with 50 mm-thick, foil-faced mineral wool and clad with 1.2 mm stucco aluminium. Valves were covered with mineral-wool bags fastened with Velcro for easy maintenance.

For more information on this story, click here: July 2014, 102
Related links:
Related articles:



modbs tv logo

ICOM celebrates Noah Gaunt as Apprentice of the Year 2026

Noah Gaunt of Vaillant Group UK has been named ICOM’s Apprentice of the Year 2026, recognising his outstanding commitment, technical excellence and passion for advancing the future of low carbon heating.

BCIA warns non-domestic buildings risk being overlooked despite decarbonisation drive

Commercial and public buildings risk being left behind in the UK’s transition to Net Zero despite more than £40 billion of funding, investment and policy support being directed towards building decarbonisation, according to the latest Policy Pulse report from the Building Controls Industry Association (BCIA).