Add-on adiabatic cooling boosts performance

EcoMesh Adiabatic Systems, adiabatic cooling, Energy Efficiency
Add-on adiabatic cooling using the EcoMesh system can improve the efficiency of dry heat rejection and increase capacity.

The efficiency and performance of air-cooled chillers and dry coolers can both be enhanced using add-on adiabatic cooling from EcoMesh Adiabatic Systems. Because no water is stored, as in a cooling tower, there is no need for water treatment. The health risks associated with legionella bacteria are also avoided.

The principle of operation is that air being drawn through the heat rejection coils first passes through a non-metallic mesh which is sprayed with water. As this water evaporates, it cools the incoming air (adiabatic cooling), which improves the efficiency of the heat-rejection coil. Systems with a water-cooled heat-rejection method are said to by around 35% more efficient than their air-cooled counterparts.

These meshes can be fitted horizontally or vertically in any inclined position in front of a heat-rejection unit.

A simple bracket supports the mesh on the unit, whilst several clips ensure the meshes are kept away from the surface by hooking into any existing or new air-cooled heat-rejection surface.

This simplicity of design enables EcoMesh to be easily retrofitted to an existing heat-rejection system to improve efficiency or increase capacity.

For more information on this story, click here: September 2014, 100
Related links:
Related articles:



modbs tv logo

Grenfell is the building industry's Piper Alpha says CIBSE

The recent passage of the Building Safety Act is a welcome recognition of the fact that making safe buildings is a highly skilled operation says the Chartered Institution of Building Services Engineers, endorsing the need for more effective regulation and a profound change in culture.

Underlying project-starts uptick indicates gradual recovery, Glenigan data suggests

  • 13% rise in detailed planning approvals against the preceding three months
  • 18% decline in main contract awards against the previous year
  • 9% increase in underlying starts during the three months to May

Glenigan has released the June 2022 edition of its Construction Review.