Eliminating pluming from condensing boilers

Glow-worm has tackled the problem of the vapour cloud that can surround the flue terminal from a condensing boiler with a kit that enables the flue outlet from a horizontal terminal to be raised by up to 6 m. It is based on 50 mm push-fit waste-pipe fittings. These kits can be used with all of the Glow-worm range of high-efficiency domestic heating boilers, and can be retro-fitted onto the standard horizontal flue terminal.
Related links:



modbs tv logo

ICOM celebrates Noah Gaunt as Apprentice of the Year 2026

Noah Gaunt of Vaillant Group UK has been named ICOM’s Apprentice of the Year 2026, recognising his outstanding commitment, technical excellence and passion for advancing the future of low carbon heating.

BCIA warns non-domestic buildings risk being overlooked despite decarbonisation drive

Commercial and public buildings risk being left behind in the UK’s transition to Net Zero despite more than £40 billion of funding, investment and policy support being directed towards building decarbonisation, according to the latest Policy Pulse report from the Building Controls Industry Association (BCIA).