Trane’s test centre is fully operational

Trane, test centre, chiller, heat pump, air conditioning

Trane’s new state-of-the-art testing facility in Epinal, France, is now fully operational. It is located in the production and design centre and will function as a validation centre for new-product development, enabling the simulation of all operating conditions encountered during the life of HVAC equipment.

Louis Rompre, portfolio manager for Trane in Europe, says, ‘Our customers demand more configurations, tiers and options than ever before, and this facility will help us meet their needs through innovation and development of products with proven performance at the top of the industry.’

This new testing centre enables customers to witness test their HVAC solutions for specific applications within customised conditions.

This 5000 m3 climate chamber can have air temperature controlled from -25°C to +60°C with RH from 10 to 90%. Water-side temperatures can be controlled from 12°C to +65°C.

Its fast and accurate control system ensures stable and homogenous testing conditions within EN 14511 and Eurovent standard requirements

The facility can test air-cooled and water-cooled chillers and multi-pipe systems from 200 to 1700 kW and heat pumps from 2000 to 1000 kW.

70% of the motors in the facility have variable-speed drives. Up to 100% of a tested unit’s rejected energy can be used to air condition the test chamber itself.

Related links:
Related articles:



modbs tv logo

Finalists announced for the 2025 Pump Industry Awards

The Pump Industry Awards has revealed its highly anticipated finalists for 2025, showcasing the very best in innovation, performance and contribution across the pump sector. The winners will be celebrated at the prestigious gala dinner on Thursday 13th March at the Hilton Hotel, St. Georges Park in Burton on Trent.

Electrical businesses brace for project delays in 2025

The latest quarterly Building Engineering Business Survey (BEBS) has revealed that close to two thirds (63%) of electrotechnical and engineering services businesses are worried about delays to projects and the impact this can have on cashflow.