KalGuard limescale preventer in 22 mm size

pipe, pipework, pipe services, Kalguard, limescale

Commercial now offers its KalGuard system for preventing limescale formation as a 22 mm package suitable for most small commercial buildings. It includes a zinc anode unit, water meter and controller that is set to a 22 mm commissioning mode to create a true plug-and-play solution.

KalGuard permanently conditions water by dosing it with a very low level of stable zinc via an electrolytic process. Calcium-carbonate crystals form as aragonite, which does not form a deposit, rather than a deposit-forming calcite (limescale).

The system is recommended by the UK building-services compliance guide to Part L. Independent tests at Cranfield University have shown its ability to reduce limescale significantly.

For more information on this story, click here: October 2015, 86
Related links:
Related articles:



modbs tv logo

Government must do more to tackle heat pump and electric vehicle barriers, Which? says

Which? is calling on the government to provide more support for greener home heating and cars, as new research shows cost and other barriers are putting people off making the switch.

New study reveals job stress affects 70% of construction workers

A groundbreaking study conducted by researchers from the University of Cambridge has revealed that at least 70% of people in the construction industry report feeling stressed at work, and this not only has a negative impact on job performance but also personal life. The findings highlight the urgent need for effective strategies to combat workplace stress.