Airedale at Emirates Stadium

Arsenal
Airedale is to supply cooling equipment for critical IT/VT applications at the new Emirates Stadium of Arsenal football club in North London. 20 EasiCool upflow units will provide precise cooling in main data and communications rooms, primary and back-up server rooms, mobile operations rooms, PAVA rooms and substations. Essential switch rooms will be cooled by four Ecotel indoor units — self-contained systems with free-cooling capability. 22 concept Plus units are to be installed in smaller rooms such as the satellite, press and Director Club communications rooms and in out-station rooms and stub-up rooms. The slimline design of these units enables them to fit unobtrusively into restricted areas.
Related links:



modbs tv logo

Women In STEM: Breaking into A Man’s World

With the growth in the engineering sector in the last few years, the requirement of additional workers has led to an increasingly diverse workforce especially with the inclusion of women  

Legionella bacteria - Symptoms are similar to that of Covid-19

An outbreak of Legionnaires disease in the West Midlands has prompted Stuart Gizzi, Managing Director at plumbing equipment manufacturer Intatec to remind Facilities Managers that Legionella precautions can be automated 

Calendar