Airedale at Emirates Stadium

Arsenal
Airedale is to supply cooling equipment for critical IT/VT applications at the new Emirates Stadium of Arsenal football club in North London. 20 EasiCool upflow units will provide precise cooling in main data and communications rooms, primary and back-up server rooms, mobile operations rooms, PAVA rooms and substations. Essential switch rooms will be cooled by four Ecotel indoor units — self-contained systems with free-cooling capability. 22 concept Plus units are to be installed in smaller rooms such as the satellite, press and Director Club communications rooms and in out-station rooms and stub-up rooms. The slimline design of these units enables them to fit unobtrusively into restricted areas.
Related links:



modbs tv logo

Engineering alliance joins CBI asking for business rates reform in CSR & Budget

Engineering alliance Actuate UK organizations support the CBI statement on Business rates, which, together with other Trade Associations, is calling on Government to take long-term action in the forthcoming Budget and Comprehensive Spending Review.

Network Infrastructure Assistant ECS card updated to include City & Guilds

A range of ECS cards are available through the Electrotechnical Certification Scheme (ECS) for the Network Infrastructure industry.

Calendar