Mikrofill replaces boilers at Bedford Hospital

Mikrofill, boilers

The replacement of existing CHP plant at Bedford Hospital includes boilers supplied by Mikrofill. The three Ethos boilers each have an output of 130 kW and will primarily serve the hospital’s HWS demand. They are configured to provide heat into the main system when hot-water requirements are at a minimum.

These boilers have stainless-steel heat exchanges and operate in cascade so that the total output of 390 kW can be modulated down 13 kW for precise load matching.

The scheme is fully sequenced to ensure that the LTHW boilers serve heating in preference to the existing steam-to-LTHW heat exchanges. This takes load off the central plant and improves overall system efficiency.

For more information on this story, click here: May 2016, 106
Related links:
Related articles:



modbs tv logo

Fujitsu General Air Conditioning becomes GENERAL HVAC Solutions UK

Fujitsu General Air Conditioning (UK) has become GENERAL HVAC Solutions UK from 1st January 2026, strengthening its long-term position within the global Paloma Rheem Holdings (PRH) group.

Market performance indicates encouraging signs for future of BEMS sector

Highlighting an increased desire from property developers, architects and designers to decarbonise the UK’s building stock through the specification and implementation of building controls and automation, the building energy management systems (BEMS) market showed steady progress in Q3 – rising 2.6% compared to the previous quarter.