Crane Dominates at Tower Wharf

Crane
Control valves for the heating and air-conditioning systems in this Development at Bristol are being supplied by Crane Fluid Systems.
Crane’s Z3000 Dominator flow-management system for fan-coil units is among a full range of control valves being supplied by Crane Fluid Systems for management of the heating and air-conditioning systems for Tower Wharf on Bristol’s floating harbour district. This 6-storey office development of 6600 m2 has a 4-storey glazed atrium entrance and distinctive waterfront elevation. The Dominator system combines all required valve components and connecting pipework into one unit, fully assembled and ready to connect.
Related links:



modbs tv logo

Women In STEM: Breaking into A Man’s World

With the growth in the engineering sector in the last few years, the requirement of additional workers has led to an increasingly diverse workforce especially with the inclusion of women  

Legionella bacteria - Symptoms are similar to that of Covid-19

An outbreak of Legionnaires disease in the West Midlands has prompted Stuart Gizzi, Managing Director at plumbing equipment manufacturer Intatec to remind Facilities Managers that Legionella precautions can be automated 

Calendar