Crane Dominates at Tower Wharf

Crane
Control valves for the heating and air-conditioning systems in this Development at Bristol are being supplied by Crane Fluid Systems.
Crane’s Z3000 Dominator flow-management system for fan-coil units is among a full range of control valves being supplied by Crane Fluid Systems for management of the heating and air-conditioning systems for Tower Wharf on Bristol’s floating harbour district. This 6-storey office development of 6600 m2 has a 4-storey glazed atrium entrance and distinctive waterfront elevation. The Dominator system combines all required valve components and connecting pipework into one unit, fully assembled and ready to connect.
Related links:



modbs tv logo

The electric economy

Universities drive down carbon emissions

Kevin Pocock of Mitsubishi Electric discusses the drivers for universities to achieve zero carbon in their built environment – and the challenges.

Calendar
  • Calendar Icon
    11 November, 2020, 10:00 - 12 November, 2020, 16:00
    elemental
  • Calendar Icon
    20 November, 2020, 19:00 - 23:59
    CSA Awards