Crane Dominates at Tower Wharf

Crane
Control valves for the heating and air-conditioning systems in this Development at Bristol are being supplied by Crane Fluid Systems.
Crane’s Z3000 Dominator flow-management system for fan-coil units is among a full range of control valves being supplied by Crane Fluid Systems for management of the heating and air-conditioning systems for Tower Wharf on Bristol’s floating harbour district. This 6-storey office development of 6600 m2 has a 4-storey glazed atrium entrance and distinctive waterfront elevation. The Dominator system combines all required valve components and connecting pipework into one unit, fully assembled and ready to connect.
Related links:



modbs tv logo

CSA Awards entry total breaks new record

The Commissioning Specialists Association (CSA) 2023 Awards attracted a record number of submissions across the seven main categories, with Roger Carlin of Ashford Environmental Services receiving the Lifetime Contribution Award.

Prince of Wales learns about climate tech innovation during visit

HRH The Prince of Wales recently visited technology hub Sustainable Ventures, which is based in London’s County Hall and is the largest of its type in Europe.

Calendar