Crane Dominates at Tower Wharf

Crane
Control valves for the heating and air-conditioning systems in this Development at Bristol are being supplied by Crane Fluid Systems.
Crane’s Z3000 Dominator flow-management system for fan-coil units is among a full range of control valves being supplied by Crane Fluid Systems for management of the heating and air-conditioning systems for Tower Wharf on Bristol’s floating harbour district. This 6-storey office development of 6600 m2 has a 4-storey glazed atrium entrance and distinctive waterfront elevation. The Dominator system combines all required valve components and connecting pipework into one unit, fully assembled and ready to connect.
Related links:



modbs tv logo

Thirteen boosts FM services with BigChange mobile tech

The North East’s largest housing association, Thirteen is transforming its facilities management (FM) services with new mobile workforce management technology supplied by Leeds-based BigChange. 

Schneider Electric and Sustainable Ventures Announce Net Zero Home Programme Finalists

Schneider Electric and Sustainable Ventures have named the finalists of their Net Zero Home Programme. 

Calendar