Heat-pump gives 5-star performance in hotel

Calorex
Seven Calorex heat pumps in a Bangkok hotel cool spaces with heat problems and put the heat into hot-water circuits — replacing an oil-fired boiler.
Replacing oil-fired boilers with an air-to-water heat-pump, heat-recovery system in a luxury hotel in Bangkok will achieve a payback of four years. BTP Thailand has installed seven Calorex units in the 428-bedroomed Radisson Hotel, and the boiler is only required for back up. The system generates free cooling, via a ductwork system, for areas that had previously suffered extreme heat problems, such as the laundry room, lift control room and the lobby. AW1534 floor-standing heat pumps extract energy from an air source and upgrade it to heat for water systems with a COP of up to five.
Related links:



modbs tv logo

EBSSA publishes Strategic Skills Plan

The Engineering and Building Services Skills Alliance (EBSSA) has published its strategic Sector Skills Plan, as part of the work undertaken by the Construction Mission Skills Board.

AI automation boosts efficiency at Polypipe Building Services’ manufacturing site

Polypipe Building Services has enhanced manufacturing efficiency, productivity and sustainability through a major programme of automation investment at its production facility in Aylesford.