Mikrofill supplies new plant for luxury hotel

Mikrofill, boilers, DHW

Upgrading the existing oil-fired LPHW and HWS circuits at a hotel operated by Amazing Venues group included the installation of four Mikrofill condensing boilers, two pressurisation packages and three Extreme HWS loading cylinders complete with unvented kits. The design for Stanbrook Abbey Hotel near Worcester was prepared by building-services consultants Energy Performance Solutions.

The equipment was installed in two plantrooms. To preserve the character of the building in which one plantroom was located, the existing brick chimney stacks were lined to accommodate the new boilers.

The boilers have a high turndown ratio — 40:1 on one plantroom and 20:1 in the other.

The new equipment was installed by mechanical contractor Daly Engineering Services.

For more information on this story, click here: May 2017, 88
Related links:
Related articles:



modbs tv logo

Yorkshire and Humber leaders set out plans to tackle skills shortages

Leaders from across Yorkshire and the Humber came together on Friday 11th September to launch ambitious plans aimed at tackling the region’s growing construction skills shortages.

Six in 10 UK businesses look to adapt operations in response to extreme heat

According to the Q2 Barclays Business Prosperity Index, six in 10 businesses surveyed (60%) have either increased investment to adapt to extreme heat (37%) or are considering doing so (23%).