Dunphy burners serve hospital during refurbishment work

Dunphy
Three temporary boiler houses for Doncaster Royal Infirmary benefit form the close physical matching of Dunphy burners and Byworth boilers to achieve compact skid-mounted packages.
While renewing and refurbishing its coal-fired energy centre Doncaster Royal Infirmary has installed three prefabricated and temporary burner/boiler units to main the supply of heat and steam. The combination of Dunphy burners and Byworth boilers used has a footprint that avoids any overlap on skids. Both pieces of equipment are compact and space saving and fit into the restricted boiler houses. The high combustion efficiency of the burners and the resultant high boiler efficiency achieve carbon emissions that are among the lowest in the industry. The burners are designed on the axial-airflow concept, which ensures high combustion efficiency across a wide turndown range and a lower fuel consumption. The motor is encapsulated in a monobloc aluminium burner housing, achieving very quiet operation without additional outlay for acoustic shrouds.
Related links:



modbs tv logo

Yorkshire and Humber leaders set out plans to tackle skills shortages

Leaders from across Yorkshire and the Humber came together on Friday 11th September to launch ambitious plans aimed at tackling the region’s growing construction skills shortages.

Six in 10 UK businesses look to adapt operations in response to extreme heat

According to the Q2 Barclays Business Prosperity Index, six in 10 businesses surveyed (60%) have either increased investment to adapt to extreme heat (37%) or are considering doing so (23%).