Reznor shows the way to energy-efficient space heating

warehouse
Effective and energy-efficient heating for the racking area of the refurbished premises of H. C. Slingsby Plc is provided by 17 Reznor V3 gas-fred heaters and 19 Maximizor destratification fans.
Reznor gas-fire unit heaters installed as part of the refurbished of the warehouse, production and distribution centre of H. C. Slingsby Plc in Shipley deliver temperature-controlled warm air between the racking without impeding the manoeuvrability of fork-lift trucks and pickers. The V3 heaters qualify for Enhanced Capital Allowances and were installed by Ellison Energy Services of Shipley. The 6500 m2 warehouse and production facility has 17 heaters installed at high level between the racks. To enhance the efficiency of this heating installation, 19 ceiling-mounted Maximizor destratification fans recirculate warm air from high level to floor level. The heaters and destratification fans are programmed to work together to minimise fuel consumption. The whole system is controlled by a fully programmable heating-management system managed remotely from a PC.
Related links:



modbs tv logo

CIBSE and BEIS launch new free guidance for large heat pump installations in non-domestic buildings

The Chartered Institution of Building Services Engineers (CIBSE) and the Department for Business, Energy & Industrial Strategy (BEIS) have launched new guidance AM17: Heat pumps for large non-domestic buildings. 

Construction Skills Certification Scheme (CSCS) Smart Check launched to boost competence and fight fraud

Construction Skills Certification Scheme (CSCS) has developed a ‘Smart Check’ app to help construction site operators verify the identities and qualifications of more than two million skills card holders.