Thirsty work

Thirsty work

The J & E Hall CellarPlus cooling system has been chosen by refrigeration and air conditioning contractor PAR Services to ensure cold beer on-tap for the thousands of visitors at Doncaster Rovers Football Club.

Yorkshire based PAR Services was contracted to upgrade the old unit at the Eco Power Stadium in Doncaster, which had failed. The failure meant the football club had to discard a significant amount of beer which was rendered unfit for sale, causing a financial impact for the club.

J & E Hall's CellarPlus cooling system provided a cost effective and reliable replacement. The system was fitted on the wall of the cellar to optimise floor space whilst ensuring maximum storage capacity for beer and drinks. The 8KW single evaporator cellar cooling system has a three-phase outdoor condensing unit, to enhance energy efficiency. The system operates using low GWP refrigerants R448A or R449A, keeping the club's beverage offering fresh and at the optimum temperature of 4°C for sale.

Related links:
Related articles:



modbs tv logo

Government must do more to tackle heat pump and electric vehicle barriers, Which? says

Which? is calling on the government to provide more support for greener home heating and cars, as new research shows cost and other barriers are putting people off making the switch.

New study reveals job stress affects 70% of construction workers

A groundbreaking study conducted by researchers from the University of Cambridge has revealed that at least 70% of people in the construction industry report feeling stressed at work, and this not only has a negative impact on job performance but also personal life. The findings highlight the urgent need for effective strategies to combat workplace stress.