Light reading

Exeter College Library

DHA Designs has completed a transformative lighting design project for the historic Exeter College Library.

Originally constructed in 1857 by renowned architect George Gilbert Scott, the neo-gothic library is a treasured architectural gem in Oxford. The project’s primary challenge was to meet the needs of the college and its students while honouring the library’s heritage. Key to this was the provision of suitable lighting for reading desks and bookshelves, alongside creating a calm, inviting atmosphere that encourages study.

The main building features tall, free-standing bookcases that were meticulously removed and refurbished, which allowed DHA Designs to fix lights and cabling to the tops of these cases without damaging their fabric. These cantilevered lights then cast light down over the shelves. Additionally, an uplighting system on top of the bookcases highlights the intricate decorative ceilings, showcasing the library’s architectural splendour.

Custom-made oak desks, equipped with integrated task lights, offer students personalised control over their lighting. These task lights not only blend seamlessly with the bookcases but also feature energy-saving automatic shut-off functionality.

All lighting elements are connected to a sophisticated control system, allowing for dimming and switching based on time of day or student needs. This ensures an optimal balance of lighting and energy efficiency, tailored to the dynamic requirements of the library’s users.

Related links:
Related articles:



modbs tv logo

Finalists announced for the 2025 Pump Industry Awards

The Pump Industry Awards has revealed its highly anticipated finalists for 2025, showcasing the very best in innovation, performance and contribution across the pump sector. The winners will be celebrated at the prestigious gala dinner on Thursday 13th March at the Hilton Hotel, St. Georges Park in Burton on Trent.

Electrical businesses brace for project delays in 2025

The latest quarterly Building Engineering Business Survey (BEBS) has revealed that close to two thirds (63%) of electrotechnical and engineering services businesses are worried about delays to projects and the impact this can have on cashflow.