Storing rainwater underground is part of cooling strategy for Kent college

Scematic
Rainwater stored in an underground tank provides a heat sink to cool the atrium of these new boarding facilities for a college in Kent and also to provide water for WCs and water the grounds.
Some of the latest thinking in controlling internal temperatures in the summer are being applied in a new £4 million boarding block for St Lawrence College in Kent. The scheme devised by consulting engineers Crofton Design will incorporate a system to harvest all rain falling on the building. This water will be stored in a 36 000 litre underground tank to be filtered and used for flushing WCs and watering the grounds. The rainwater store will be used as a heat sink to cool the building in summer, taking advantage of the constant underground temperature of 12°C to provide cool water to circulate through the underfloor heating system to cool the atrium. A mixed-mode ventilation system will also be employed, driven by the natural stack effect, with assistance from extract fans. The ventilation air will be drawn through large concrete underground ducts to pre-cool the air and help control temperatures in the summer. Crofton Design has included underfloor heating throughout the development. It will be supplied by fully modulating gas-fired condensing boilers. M&E services sub-contractors is Halsion Ltd.
Related links:



modbs tv logo

BPMA and AEMT Sign Mutual Co-operation Agreement

The British Pump Manufacturers’ Association (BPMA) and the Association of Electrical and Mechanical Trades (AEMT) are pleased to announce the recent signing of a Mutual Co-operation Agreement. 

ECA calls for urgent energy price reform

The ECA has warmly welcomed the urgent reform of electricity pricing recommended by The Climate Change Committee today. The latest CCC report to Parliament recommends that future energy pricing must remove current fiscal disincentives to electrification, boosting the deployment and use of low carbon electrical energy across the UK.