Cutting the cost of baggage handling

cablofil
The rapid-installation capabilities of Cablofil’s wire-mesh cable tray reduced the installation costs of the baggage-handling system in Terminal 5 at Heathrow Airport.
Cablofil has supplied standard and modified wire-mesh cable tray and accessories for 26 km of baggage-handling conveyors in Terminal 5 at Heathrow Airport. Materials-handling specialist Vanderlande Industries chose the product because it was suitable for the flat cables and flexible busbar used throughout the system and it was easy to make tap-offs at any point. Because every baggage-handling system is unique, the tray was fitted on site, exploiting the fact that wire-mesh tray is easy to cut and bend into complex shapes without specialist tools. To help keep down installation costs, Cablofil offered an on-site free training course for all contractors. Standard products met most needs. Among the special requirements was to develop a tray size to fit into confined spaces in the conveyor system. This tray is 85 mm wide and 47 mm deep, created by folding a standard product in a different way. An adjustable custom-made lid follows curves around the baggage-handling system. Accessories were supplied off the shelf by wholesaler Hagermeyer.
Related links:



modbs tv logo

Government must do more to tackle heat pump and electric vehicle barriers, Which? says

Which? is calling on the government to provide more support for greener home heating and cars, as new research shows cost and other barriers are putting people off making the switch.

New study reveals job stress affects 70% of construction workers

A groundbreaking study conducted by researchers from the University of Cambridge has revealed that at least 70% of people in the construction industry report feeling stressed at work, and this not only has a negative impact on job performance but also personal life. The findings highlight the urgent need for effective strategies to combat workplace stress.