Grundfos powers fire safety at Emirates Stadium

arsenal
Opened by Prince Philip at the end of October, the Emirates Stadium has a bespoke fire system designed by Grundfos Pumps.
The fire-safety system for the 60 000-seat Emirates Stadium of Arsenal Football Club is based on a bespoke solution designed by Grundfos Pumps. It comprises a diesel/electric fire sprinkler pump system and a hose-reel packaged set. It was commissioned and installed in partnership with Hall & Kay Fire Engineering of Windsor. The hose-reel set incorporates Grundfos CRI multi-stage centrifugal pumps.
Related links:



modbs tv logo

Carrier calls for prioritisation of ventilation in NHS infrastructure plans

As the healthcare sector begins
to plan how new government infrastructure funding will be spent, Carrier is urging NHS estates teams to prioritise ventilation upgrades as part of long-term building improvement strategies.

Specifiers urged to act ahead of looming legislation

Specifiers are being encouraged to switch to efficient secondary hot water circulators ahead of anticipated legislation that will ban inefficient versions of these domestic and commercial plumbing products.