Scorpion ensure Scotland’s Secret Bunker keeps working

To protect Scotland’s Secret Bunker, one of the country’s foremost tourist attractions, from power cuts, Scorpion Power Systems has supplied a state-of-the-art power system to support the operational facilities and telephones, air conditioning and essential services. Situated at Troy Wood, five miles south east of St Andrews, Scotland’s Secret Bunker was, until 1992, an underground nuclear command bunker used by the Government during the Cold War. It was decommissioned in 1993 and purchased by James Mitchell, who turned it into a leading tourist attraction in 1995. Scorpion’s turnkey service included everything from the site survey right through to commissioning. The project uses a DV 275 kVA generator continuously rated generator with a super-silent, weatherproof acoustic canopy and remote start. It is installed in a steel bund to contain any diesel spillage. Other features include an externally mounted exhaust system and a water-jacket heater to keep the engine at optimum temperature for fast and efficient starting and rapid load acceptance. Scorpion delivered the generator to site, installed it, along with all exhaust, ductwork and cabling work and final commissioning.



modbs tv logo

Schneider Electric and RIB back industry-leading Embodied Carbon Calculator technology

Schneider Electric and RIB have partnered with Building Transparency, a non-profit organisation that has developed the Embodied Carbon Calculator.

BEAMA releases tool to help heating installers explain the new requirement in the Building Regulations to their customers

New regulations for existing homes mean that, from June 15th, 2022, heating installers will be required to install thermostatic room controls when replacing a boiler.