Grundfos is tried and tested at Twickenham

grundfos
To meet the water requirements in the latest developments at Twickenham, Grundfos has supplied two Hydro booster sets.
The most recent changes to the Twickenham stadium involve the redevelopment of the South Stand to increase capacity from 74 000 to 82 000 and provide new changing rooms, hospitality boxes, bars and restaurants. Grundfos Pumps worked with consultant Ove Arup and contractor Lorne Stewart to provide two booster sets to ensure there is sufficient water available to meets guests’ needs. The Hydro booster sets selected were fitted with energy-efficient electronically controlled pumps from Grundfos’s CRiE range.
Related links:



modbs tv logo

Women In STEM: Breaking into A Man’s World

With the growth in the engineering sector in the last few years, the requirement of additional workers has led to an increasingly diverse workforce especially with the inclusion of women  

Legionella bacteria - Symptoms are similar to that of Covid-19

An outbreak of Legionnaires disease in the West Midlands has prompted Stuart Gizzi, Managing Director at plumbing equipment manufacturer Intatec to remind Facilities Managers that Legionella precautions can be automated 

Calendar