Grundfos is tried and tested at Twickenham

grundfos
To meet the water requirements in the latest developments at Twickenham, Grundfos has supplied two Hydro booster sets.
The most recent changes to the Twickenham stadium involve the redevelopment of the South Stand to increase capacity from 74 000 to 82 000 and provide new changing rooms, hospitality boxes, bars and restaurants. Grundfos Pumps worked with consultant Ove Arup and contractor Lorne Stewart to provide two booster sets to ensure there is sufficient water available to meets guests’ needs. The Hydro booster sets selected were fitted with energy-efficient electronically controlled pumps from Grundfos’s CRiE range.
Related links:



modbs tv logo

Four new appointments at BCIA

THE Building Controls Industry Association (BCIA) has appointed a new Vice-President and three new additions to its Management Committee.

Engineering services alliance welcomes retentions reporting legislation

Engineering services alliance Actuate UK has warmly welcomed the new secondary legislation which will require reporting of cash retentions held by the large construction companies under the Reporting Regulations.