Grundfos is tried and tested at Twickenham

grundfos
To meet the water requirements in the latest developments at Twickenham, Grundfos has supplied two Hydro booster sets.
The most recent changes to the Twickenham stadium involve the redevelopment of the South Stand to increase capacity from 74 000 to 82 000 and provide new changing rooms, hospitality boxes, bars and restaurants. Grundfos Pumps worked with consultant Ove Arup and contractor Lorne Stewart to provide two booster sets to ensure there is sufficient water available to meets guests’ needs. The Hydro booster sets selected were fitted with energy-efficient electronically controlled pumps from Grundfos’s CRiE range.
Related links:



modbs tv logo

Government must do more to tackle heat pump and electric vehicle barriers, Which? says

Which? is calling on the government to provide more support for greener home heating and cars, as new research shows cost and other barriers are putting people off making the switch.

New study reveals job stress affects 70% of construction workers

A groundbreaking study conducted by researchers from the University of Cambridge has revealed that at least 70% of people in the construction industry report feeling stressed at work, and this not only has a negative impact on job performance but also personal life. The findings highlight the urgent need for effective strategies to combat workplace stress.