Grundfos is tried and tested at Twickenham

grundfos
To meet the water requirements in the latest developments at Twickenham, Grundfos has supplied two Hydro booster sets.
The most recent changes to the Twickenham stadium involve the redevelopment of the South Stand to increase capacity from 74 000 to 82 000 and provide new changing rooms, hospitality boxes, bars and restaurants. Grundfos Pumps worked with consultant Ove Arup and contractor Lorne Stewart to provide two booster sets to ensure there is sufficient water available to meets guests’ needs. The Hydro booster sets selected were fitted with energy-efficient electronically controlled pumps from Grundfos’s CRiE range.
Related links:



modbs tv logo

WIN a Bang & Olufsen speaker system – in the MBS subscriber prize draw 2024

Subscribe, or renew your free subscription, to MBS between 1st June and September 30 2024 and you could win a great prize.

Going Underground

ABM has announced a significant contract win with Transport for London (TfL) to provide mechanical and electrical (M&E) services across the London Underground network.