Installation and running cost savings are both being achieved in this prestigious office building using an Ex-Or lighting-control system.
The need to install light switches in open-plan areas of a 3-storey office building at Burgess Hill has been eliminated by an Ex-Or lighting-control system which switches lights on and off in response to signals from presence detectors that respond to the smallest movements made by occupants; lights are also dimmed as required. The latest Building Regulations stipulate that light switches should be no further than 6 m away from the workstations of occupants. The building is now occupied by an international pharmaceuticals company as its UK headquarters. Other benefits of the lighting-control system include significant savings in energy costs. Lighting is typically half of the electricity costs of an office building, and could readily be halved by such control. The Ex-Or equipment was specified by KLEC services of Farnham. Martin Clow of KLEC says, ‘We’ve had experience of using Ex-Or equipment in other projects. We also get extremely good service from the Ex-Or project engineers and their teams. This was a big project, but had to be fast tracked into a 16-week period, so it was vital that we had total confidence in the equipment.’ Enquiry Number 94
Related links:



modbs tv logo

Smart Buildings Show conference programme is now LIVE

The conference programme for Smart Buildings Show 2025 is now live and there’s a lot on offer from industry leading speakers who will debate emerging trends and provide a wealth of information to guide you towards efficiency in your buildings.

Rinnai UK launches applied products division

Rinnai is launching a new division - Rinnai Applied - which will be dedicated to the design, supply and service of larger HVAC units and systems that will meet the specific heating, ventilation, air conditioning and hot water demands of commercial and industrial premises.