Big savings for hot workers

fire engine
Fire and rescue work can be hot and dirty, so when the heating and hot-water system at Bolton’s Central Fire Station was renewed, it was important to ensure high efficiency as well as meeting the station’s considerable heating and hot-water loads. Four Viessmann Vitodens 300 condensing boilers at 66 kW each were installed in a cascade system. Contributing to energy saving and carbon reduction in two ways, the boilers have a combustion efficiency of 98% and low LOX and other flue emissions. The cascade system means that load and demand are closely matched as effectively the heating can operate at as low as a 16:1 turndown ratio.
Related links:



modbs tv logo

Government must do more to tackle heat pump and electric vehicle barriers, Which? says

Which? is calling on the government to provide more support for greener home heating and cars, as new research shows cost and other barriers are putting people off making the switch.

New study reveals job stress affects 70% of construction workers

A groundbreaking study conducted by researchers from the University of Cambridge has revealed that at least 70% of people in the construction industry report feeling stressed at work, and this not only has a negative impact on job performance but also personal life. The findings highlight the urgent need for effective strategies to combat workplace stress.