Big Foot Systems unique walkway concept

walkway
Rapid Walkway is a versatile and economical solution to roof access problems. It provides a formal route for maintenance engineers and a safe pathway for personnel. The galvanised steel frame and anti-slip glass-fibre grid are simply bolted together and mounted on anti-vibration blocks. This spreads heavy loads on delicate roofs without penetrating the surface. The modular design enables a team of two to construct a 30 m run in under an hour. Optional safety hand rails can be easily fitted during or post installation. Rapid Walkway is delivered from stock, flat packed in 1, 2 and 3 m lengths and 90° corner sections.
For more information on this story, click here:Feb o8, 207



modbs tv logo

BCIA welcomes tougher commercial building energy standards but calls for greater ambition across the wider sector

The Building Controls Industry Association (BCIA) has welcomed the government’s confirmation that privately rented non-domestic buildings over 1,000 square metres in England and Wales will be expected to achieve a minimum EPC B rating by 2031, describing the move as an important step forward in improving the energy performance of the UK’s commercial building stock.

GOLDBECK commits to three-year schools partnership to inspire Cardiff’s future construction talent

GOLDBECK has launched a new long-term education initiative in Cardiff, committing to support three local primary schools as part of a programme designed to introduce young children to enterprise, careers and the wider world of construction.