Ex-Or cuts costs for the London Fire Brigade

EX-Or
Electricity costs in the Southwark training centre of the London Fire Brigade have been cut by 25% following the installation of an Ex-Or lighting-control system.
25% has been lopped off the electricity bill of the main training centre of the London Fire Brigade in Southwark following the installation of Ex-Or lighting controls. This 7700 m2 specialist training centre is one of the largest buildings in the LFB’s estate. LightSpot presence-detecting lighting controls have been installed by the company’s own installation engineers in all parts of the centre. The LFB plans to control lighting throughout its estate by installing Ex-Or equipment for the management of lighting. The LightSpot presence detection system comprises discrete controllers with integral photocells to automatically switch lights on and off by monitoring the presence of occupants and measuring the amount of natural light available. The installation work was carried out over four weeks with minimal disruption.
For more information on this story, click here: April 08, 102
Related links:



modbs tv logo

BCIA welcomes tougher commercial building energy standards but calls for greater ambition across the wider sector

The Building Controls Industry Association (BCIA) has welcomed the government’s confirmation that privately rented non-domestic buildings over 1,000 square metres in England and Wales will be expected to achieve a minimum EPC B rating by 2031, describing the move as an important step forward in improving the energy performance of the UK’s commercial building stock.

GOLDBECK commits to three-year schools partnership to inspire Cardiff’s future construction talent

GOLDBECK has launched a new long-term education initiative in Cardiff, committing to support three local primary schools as part of a programme designed to introduce young children to enterprise, careers and the wider world of construction.