Ex-Or cuts costs for the London Fire Brigade

EX-Or
Electricity costs in the Southwark training centre of the London Fire Brigade have been cut by 25% following the installation of an Ex-Or lighting-control system.
25% has been lopped off the electricity bill of the main training centre of the London Fire Brigade in Southwark following the installation of Ex-Or lighting controls. This 7700 m2 specialist training centre is one of the largest buildings in the LFB’s estate. LightSpot presence-detecting lighting controls have been installed by the company’s own installation engineers in all parts of the centre. The LFB plans to control lighting throughout its estate by installing Ex-Or equipment for the management of lighting. The LightSpot presence detection system comprises discrete controllers with integral photocells to automatically switch lights on and off by monitoring the presence of occupants and measuring the amount of natural light available. The installation work was carried out over four weeks with minimal disruption.
For more information on this story, click here: April 08, 102
Related links:



modbs tv logo

Smart Buildings Show conference programme is now LIVE

The conference programme for Smart Buildings Show 2025 is now live and there’s a lot on offer from industry leading speakers who will debate emerging trends and provide a wealth of information to guide you towards efficiency in your buildings.

Rinnai UK launches applied products division

Rinnai is launching a new division - Rinnai Applied - which will be dedicated to the design, supply and service of larger HVAC units and systems that will meet the specific heating, ventilation, air conditioning and hot water demands of commercial and industrial premises.