EarthEnergy helps exploits ground energy in Camden

To meet the requirements of the Greater London Authority to use as much green energy as possible, the conversion of a former Victorian warehouse in Camden will have heating and cooling provided by ground-source heat pumps, with solar-thermal panel for domestic hot water. This mixed-use development includes shops, offices and 24 apartments. EarthEnergy is drilling 27 boreholes, each 100 m deep, in the existing underground basement. The geothermal loops will be connected into the plant room, with all pipework hidden below the basement slab.
For more information on this story, click here:Aug, 08 213
Related links:



modbs tv logo

Engineering alliance joins CBI asking for business rates reform in CSR & Budget

Engineering alliance Actuate UK organizations support the CBI statement on Business rates, which, together with other Trade Associations, is calling on Government to take long-term action in the forthcoming Budget and Comprehensive Spending Review.

Network Infrastructure Assistant ECS card updated to include City & Guilds

A range of ECS cards are available through the Electrotechnical Certification Scheme (ECS) for the Network Infrastructure industry.

Calendar