Danlers lighting controls for UK Storage at Bridgwater

Danlers lighting controls

Passive infra-red occupancy switches, made by Danlers have been installed at UK Storage in Bridgwater to cover 400 individual storage units. Long-range directional switches (pictured) with coverage up to 25 m, ceiling flush-mounted and ceiling surface-mounted PIR occupancy switches were also supplied.

These controls make possible considerable cost and energy savings by automatically switching lights on when an area is occupied and off when the area is vacant for a chosen duration

For more information on this story, click here: Jan 09, 202
Related links:



modbs tv logo

LG supports fast-moving WeWork project

How LG Air Conditioning helped WeWork London achieve a fast project with great results.

Stephen Preece on the future of MEES

Stephen Preece on why the next iteration of MEES needs to set higher targets to encourage greater action.

Calendar