Danlers lighting controls for UK Storage at Bridgwater

Danlers lighting controls

Passive infra-red occupancy switches, made by Danlers have been installed at UK Storage in Bridgwater to cover 400 individual storage units. Long-range directional switches (pictured) with coverage up to 25 m, ceiling flush-mounted and ceiling surface-mounted PIR occupancy switches were also supplied.

These controls make possible considerable cost and energy savings by automatically switching lights on when an area is occupied and off when the area is vacant for a chosen duration

For more information on this story, click here: Jan 09, 202
Related links:



modbs tv logo

WSCAD SUITE X PLUS is now available

WSCAD announces the launch of the new SUITE X PLUS

Condair appoints new service engineer in Scotland

Condair, has appointed Adam Norton as a humidifier service engineer based out of Edinburgh.

Calendar