Danlers lighting controls for UK Storage at Bridgwater

Danlers lighting controls

Passive infra-red occupancy switches, made by Danlers have been installed at UK Storage in Bridgwater to cover 400 individual storage units. Long-range directional switches (pictured) with coverage up to 25 m, ceiling flush-mounted and ceiling surface-mounted PIR occupancy switches were also supplied.

These controls make possible considerable cost and energy savings by automatically switching lights on when an area is occupied and off when the area is vacant for a chosen duration

For more information on this story, click here: Jan 09, 202
Related links:



modbs tv logo

CSA Awards entry total breaks new record

The Commissioning Specialists Association (CSA) 2023 Awards attracted a record number of submissions across the seven main categories, with Roger Carlin of Ashford Environmental Services receiving the Lifetime Contribution Award.

Prince of Wales learns about climate tech innovation during visit

HRH The Prince of Wales recently visited technology hub Sustainable Ventures, which is based in London’s County Hall and is the largest of its type in Europe.

Calendar