SES combines both M&E services in single module

prefab modules
Prefabricated modules combining both mechanical and electrical services are being installed for the first time by SES at the flagship Education Development in Darlington. The school will have pupils from nursery to seniors, including special-educational needs and PMLD children. Michael Dickinson, project engineer with SES, says, ‘This is the first time SES have managed to combine mechanical and electrical services on a pre-fabricated module. SES have been installing modularised pipework systems for some years. However, it is usually difficult to combine both the M&E services onto the same module. This particular project gave us the opportunity to do so.’ The main contractor is Kajima Construction Europe, with M&E design by Desco.



modbs tv logo

Fujitsu General Air Conditioning becomes GENERAL HVAC Solutions UK

Fujitsu General Air Conditioning (UK) has become GENERAL HVAC Solutions UK from 1st January 2026, strengthening its long-term position within the global Paloma Rheem Holdings (PRH) group.

Market performance indicates encouraging signs for future of BEMS sector

Highlighting an increased desire from property developers, architects and designers to decarbonise the UK’s building stock through the specification and implementation of building controls and automation, the building energy management systems (BEMS) market showed steady progress in Q3 – rising 2.6% compared to the previous quarter.