Stud fixing boosts Gripple’s effectiveness

Stud fixing
A neat and fast way of securing Gripple hangers into concrete structures is provided by stud fixings from CCL Veloduct.
CCL Veloduct offers an M8 stud fixing that provides a very quick method of securing the Gripple hanger for suspending services such as ductwork from a concrete structure. The installer has only to screw the stud end into a drop-in anchor supplied with the kit, and the Gripple fixing is ready for use. M8 is the fixing size most commonly used for ductwork, but studs can also be supplied threaded to M6. Both types are available in hollow-core anchor form for mounting hangers in hollow-core ceiling slabs. When required, studs can also be fixed to metal brackets with nuts supplied by CCL Veloduct as part of a site package.
Related links:



modbs tv logo

BCIA welcomes tougher commercial building energy standards but calls for greater ambition across the wider sector

The Building Controls Industry Association (BCIA) has welcomed the government’s confirmation that privately rented non-domestic buildings over 1,000 square metres in England and Wales will be expected to achieve a minimum EPC B rating by 2031, describing the move as an important step forward in improving the energy performance of the UK’s commercial building stock.

GOLDBECK commits to three-year schools partnership to inspire Cardiff’s future construction talent

GOLDBECK has launched a new long-term education initiative in Cardiff, committing to support three local primary schools as part of a programme designed to introduce young children to enterprise, careers and the wider world of construction.