Fast-fix detector base cuts time wasted on site

Protec

Protec has introduced a fast-fix base for its recently introduced Algo-Tec 6000Plus range of fire-detection sensors.

The design enables the sensor to be connected and commissioned before the ceiling is installed, if necessary, to save time at a critical period for a project. The whole system can then be commissioned as normal. When the ceiling is installed, the sensor, still coupled to the base, is pulled through a hole cut for it in the ceiling tile. A bezel is then attached to the sensor, and the unit is secured using integral clamp arms.

For more information on this story, click here: Dec 09, 202
Related links:
Related articles:



modbs tv logo

BEMS market shows promising performance upturn

Highlighting a determination from building owners to reduce energy consumption through technology, the building energy management systems (BEMS) market saw a 1.4% quarter-on- quarter increase in Q4 2024 – according to the Building Controls Industry Association’s (BCIA) latest market report.

Construction Carbon and CIBSE collaborate to provide environmental skills training

Construction Carbon, in collaboration with CIBSE, has announced the development of the Lifecycle Carbon Assessor Practitioner Training programme.