WindowMaster wins contract to provide natural ventilation and control for Derbyshire schools

WindowMaster, natural ventilation
Springwell Community Schools is one of 53 schools in Derbyshire for which WindowMaster is to supply natural-ventilation and control systems.

WindowMaster is supplying natural-ventilation and control systems to 53 schools in Derbyshire being built in the first phase of a 10-year Building Schools for the Future programme. Derry Building Services selected WindowMaster because it can provide an integrated approach to control of the heating and natural-ventilation systems in the schools. The first three schools in the programme are Springwell Community School, Bolsover School and Heritage School.

Springwell Community School is a specialist arts college on the campus model. It has 69 zones to be controlled, and WindowMaster has supplied 258 actuators to control windows around the building.

Bolsover School will have a natural-ventilation system with 80 zones, requiring 377 actuators.

The third school is Heritage School, whicg has 74 zones to be controlled and will include the installation of 341 actuators.

WindowMaster is supplying and mounting all the actuators and installing a control interface to the heating system. The control system will also control the Windcatchers supplied by sister company Monodraught.

WindowMaster was selected to provide the window automation system for these schools for its ability to provide complete installations — including the central computer control system.

Each installation includes motors, window actuators, various sensors and a weather station.

For more information on this story, click here: June 10, 122
Related links:
Related articles:



modbs tv logo

ICOM celebrates Noah Gaunt as Apprentice of the Year 2026

Noah Gaunt of Vaillant Group UK has been named ICOM’s Apprentice of the Year 2026, recognising his outstanding commitment, technical excellence and passion for advancing the future of low carbon heating.

BCIA warns non-domestic buildings risk being overlooked despite decarbonisation drive

Commercial and public buildings risk being left behind in the UK’s transition to Net Zero despite more than £40 billion of funding, investment and policy support being directed towards building decarbonisation, according to the latest Policy Pulse report from the Building Controls Industry Association (BCIA).