Pre-fabricated plant rooms for schools

Plant rig
Using pre-designed packaged plant rooms from Armstrong Integrated Systems, work in schools can be carried out over any weekend throughout the year — not just during the summer break.
Six pre-designed packaged plant rooms specifically for educational sites have been developed by Armstrong Integrated Systems. Instead of waiting until the summer break to build a new boiler room on site, a prefabricated plant room can be built and installed over a weekend at any time during the academic year. Final connections are simplified by using 3D graphic modelling, which enhances ability to plan the system and ensures the speed and efficiency of installation. These plant rooms are offered in a range of sizes to match load requirements from a small school to a college.
Related links:



modbs tv logo

Commercial landlords face MEES compliance crunch

Two-thirds of UK commercial real estate (CRE) owners admit they are “not fully compliant” with energy efficiency regulations, according to new research from smart buildings specialist LMG. 

Recognising outstanding achievements at CIBSE Building Performance Awards 2025

The Park Plaza Westminster Bridge in London came alive on 27th February 2025 for the prestigious CIBSE Building Performance Awards.