Standby power did what it said on the tin

Shenton Group, standby power
The recently installed standby generator at the headquarters of Henry Boot Construction quickly proved its value during a 2-hour power cut.

A standby-power system supplied to Henry Boot Construction by Shenton Group was quickly called on to protect its headquarters during a 2-hour mains failure. The system supported a range of services, including e-mail and web server, computers, telecoms and lighting. The offices of Henry Boot Construction in south Yorkshire are vulnerable to power outages, which can result in disruption and inconvenience to customers and staff.

Shenton Group won the contract in competitive tender. The complete turnkey solution included 110 kVA generator, control panel, bulk fuel tank, ductwork, commissioning and a year’s service contract.

Ken Jenkinson, senior building-services engineer with Henry Boot Construction, says, ‘When the power outage occurred recently, the generator coped very well. Shenton Group did an excellent job.’

The generator has a number of special features to ensure it is always ready for use. They include a remote monitoring panel that enables the generator to be checked quickly and easily.

For more information on this story, click here: September 2011, 128
Related links:
Related articles:



modbs tv logo

Nuaire celebrates long service and a people-first culture built over decades

Nuaire has celebrated the exceptional loyalty and dedication of its employees at a long service awards event – a powerful reflection of a workplace culture that has been built and sustained over generations.

New advanced training facility opens to upskill HVAC industry

A new education facility has opened its doors and is set to advance skills and knowledge across the UK’s HVAC industry.