Pre-fabricated wiring axes installation times

A family of modular wiring systems from Apex Wiring Solutions is described as providing a faster and more flexible alternative to conventional wiring for lighting, underfloor power and ‘buswire’ distribution systems. The use of these prefabricated modules with connectors and cable assemblies can reduce installation time by up to 70%. The lighting distribution system is available as armoured and non-armoured versions. The underfloor system provides a cost-effective alternative to traditional hard-wired and linear busbar systems. ‘Buswire’ combines the benefits of flood wiring with connectivity for building networks. All systems can be engineered for bespoke applications.
Related links:



modbs tv logo

Government’s heat pumps plan “doomed to failure”

The Government’s plan to increase heat pump installations is “doomed to failure” without a substantial increase in training for installers, according to consumer advice specialists at The Heating Hub 

Extension welcomed, but a long-term policy is still needed

The Government’s 10-point plan for a Green Industrial Revolution, is a positive step in the right direction 

Calendar