Atag’s rig for cascade boiler installations

ATAG, Heating, boiler, rig, cascade, space heating

An installation rig for Atag Heating’s Q Series condensing boilers enables up to three boilers to be installed in cascade operation. The rig is only 1.5 m high and enables boilers to be installed in a variety of configurations. Q Series boilers modulate down to 16% of full output and are up to 109.3% efficient. These rigs offer outputs from 9 to 172 kW.

This cascade system comes with a full hydraulic system to suit most installation requirements — including all pipework, isolation and non-return valves, as well as gas line and low-velocity header.

The system can also be used as a separate solution to provide DHW via an indirect hot-water cylinder.

For more information on this story, click here: Oct 2013, 178
Related links:
Related articles:



modbs tv logo

Four new appointments at BCIA

THE Building Controls Industry Association (BCIA) has appointed a new Vice-President and three new additions to its Management Committee.

Engineering services alliance welcomes retentions reporting legislation

Engineering services alliance Actuate UK has warmly welcomed the new secondary legislation which will require reporting of cash retentions held by the large construction companies under the Reporting Regulations.