MHG heats former royal glasshouses

maintenance, refurbishment, boiler, space heating, MHG
Now heated by a new MHG boiler — one of two greenhouses at Osborne on the Isle of Wight.

A ProCon HT gas-fired boiler from MHG Heating was specified by consulting engineers Martin Thomas Associated to replace two increasingly unreliable cast-iron boilers serving greenhouses at Osborne on the Isle of Wight. The 150 kW boiler was installed by Clarke’s Mechanical.

This former royal residence was built as a summer home and rural retreat for Queen Victoria and Prince Albert. One of the features of the estate is a walled garden which housed a number of greenhouse. The two that remained when English Heritage took over the site in 1984 have been restored, and one contains a traditional staged bedding display.

The existing brick stack has been relined with MHG’s flexible flue system.

The open-vented heating system is separated from the boiler by a plate heat exchanger to protect it from debris in the original cast-iron pipework system. The new boiler is on a pressurised primary circuit.

Controls in the boiler enable the two greenhouses to be controlled separately to enhance energy efficiency.

For more information on this story, click here: July 2014, 84
Related links:
Related articles:



modbs tv logo

EBSSA publishes Strategic Skills Plan

The Engineering and Building Services Skills Alliance (EBSSA) has published its strategic Sector Skills Plan, as part of the work undertaken by the Construction Mission Skills Board.

AI automation boosts efficiency at Polypipe Building Services’ manufacturing site

Polypipe Building Services has enhanced manufacturing efficiency, productivity and sustainability through a major programme of automation investment at its production facility in Aylesford.