Boosting the DHW efficiency of combi boilers

Tenants of housing group A2Dominion are looking forward to savings of £150 a year in gas and water charges following the installation of Guardian Solutions Flowsave units in the DHW pipework from combi boilers. These devices reduce the flow of water from the boiler until the correct temperature has been reached. Full flow is then permitted.

The devices have been installed in a thousand properties.

By limiting the flow when a tap or shower is first turned on, the required flow temperature is reached more quickly, saving both fuel and water. Paradoxically, perhaps, hot water arrives at the outlet more quickly.

It takes just a few minutes to install a Flowsave close to the combi boiler.

For more information on this story, click here: March 2015, 82
Related links:
Related articles:



modbs tv logo

Government must do more to tackle heat pump and electric vehicle barriers, Which? says

Which? is calling on the government to provide more support for greener home heating and cars, as new research shows cost and other barriers are putting people off making the switch.

New study reveals job stress affects 70% of construction workers

A groundbreaking study conducted by researchers from the University of Cambridge has revealed that at least 70% of people in the construction industry report feeling stressed at work, and this not only has a negative impact on job performance but also personal life. The findings highlight the urgent need for effective strategies to combat workplace stress.